We strongly advise that planning applications should be submitted electronically where possible. Paper submissions will still be processed but there may be some delay in the processing.
All applications must comply with the information and document requirements as set out in the National Requirements checklist and the Local Requirements checklist for any given application type.
- Fees for planning application and consents
-
Fees are set by central government and deals with the processing of the application. The fee is non-refundable once the application has been registered. You can find out the fees through the following:
- Tips for submitting a valid application
-
To prevent any delays dealing with your application it is important to ensure that your application is complete and has been checked before submitting it to us. Details of the information required for different types of application can be found by clicking on the relevant application form in the application types section.
The top five reasons why applications are not valid when received are:
- Discrepancies between plans – for example, a window shown on a floor plan must also be shown on the elevation drawing.
- Certificates – as part of the application forms you are required to complete an ownership and these are often missed and not submitted.
- Planning fees – these need to accompany the application and until they are received the application will remain invalid (see the section on fees for planning applications and consents above).
- Unauthorised use of Ordnance Survey (OS) plans – unless you have a licence to reprint OS plans, using them as your application plans is restricted by copyright. Land Registry plans and Google Maps are also not acceptable. Buy authorised plans from the OS website or Buy authorised plans from the Planning Portal.
- Disclaimer on plans – where a plan has ‘do not scale’ on it we will have to seek the plan author’s agreement to remove this from the plan. All plans/drawings submitted as part of a planning application must be able to be scaled from.
- Out of date signatures on application forms and certificates are NOT acceptable
- CIL form must be filled out and dated on or after the application date
Example of the type of plans required as part of a planning application submission. (PDF 127 KB)
A3 size plans are preferable, and we are unable to accept plans larger than A1 size. Where possible please provide plans/drawings/documents in PDF format.
Please avoid the following on submitted plans/drawings:
- Location plan - incomplete red line not showing entire site boundary
- Block Plan – proposed works not identified on plan
- Screen shots of plans/drawings are NOT acceptable – they are not to scale
Please note that if you submit information including responses to sections in the application form which subsequently transpire to be inaccurate or false then this could impact on the timescales for issuing a decision.
- Design and access statements
-
A design and access statement is a concise report accompanying certain applications for planning permission and applications for listed building consent. They provide an outline for applicants to explain how the proposed development is suitable to the site and its setting, and demonstrate that it can be adequately accessed by prospective users. Design and access statements can help decision-making by enabling us and third parties to better understand the analysis that has supported the design of a development proposal.
The level of detail in a design and access statement should be proportionate to the complexity of the application, but should not be long.
Further advice on what a design and access statement should cover can be found in the planning practice guidance.
- Biodiversity checklist
-
All local authorities have to consider the conservation of biodiversity (natural environment) when determining a planning application. Government planning policies for biodiversity are set out in section 11 of the National Planning Policy Framework (NPPF).
As part of 1APP (National Application Form), the submission of a biodiversity survey and report is listed in Local Planning Application Requirements - further information on what is included for planning applications can be found in the biodiversity checklist.
Most of the Hampshire Local Planning Authorities (under the umbrella group of HIPOG) have adopted a joint working approach to the local requirements. All local authorities in Hampshire have identified the submission of a biodiversity survey and report as a requirement for certain application types. Find biodiversity checklists on the Hampshire County Council website.
- Community Infrastructure Levy (CIL)
-
The new Community Infrastructure Levy (CIL) came into effect from 25 June 2018 and will be payable on relevant planning permissions granted from this date. Visit the CIL pages for further information.
- Great Crested Newt District Licence Scheme
-
Great crested newt populations have suffered rapid declines over recent decades, due to habitat loss. The species spend most of their life on land in habitats such as woodland, hedgerows, grassland and scrub, but return to freshwater ponds in the spring to breed. They are generally found within 500m of ponds (although they can travel much further than this – even up to 1.6km).
Great crested newts and their habitats are fully protected by law and impacts on the species must be considered as part of the planning application process. Where impacts on newts may arise, developers should obtain a licence to make their activities lawful and ensure that the impact on the species will be mitigated. An evidence-based 'Impact Risk Zone' map has been published that shows the different risk zones for impacts on great crested newt. The Risk Zone map for Basingstoke and Deane can be seen below.
Basingstoke and Deane Borough Council holds a Great Crested Newt District (or “Organisational”) Licence, designed by NatureSpace and granted by Natural England, which provides an alternative licensing option for developments.
Please refer to the council's current guidance for further information on the Great Crested Newt District Licence Scheme page
- Nitrate Neutrality in relation to the Solent
-
Position Statement on Nitrate Neutrality in relation to The Solent
The council has recently received a consultation response from Natural England in relation to a planning application for residential development in the catchment of the River Test and Itchen (as part of the wider catchment to the Solent). As submitted, Natural England have advised that the application could have potential significant effects on Solent and Southampton Water Special Protection Area (SPA) and Solent Maritime Special Area of Conservation (SAC). Natural England have advised that they require further information in order to determine the significance of these impacts and the scope for mitigation for that application. The further information required is:
Assessment of water quality impacts of the operational phase of the development on the designated sites.
Without the submission of this information, Natural England may place an objection to proposed new residential development. The issue of nitrate impact on the Solent has received coverage in the media recently. The aforementioned consultation response is the first received in this Borough. Officers have been and continue to liaise with Natural England to understand the specific issues as far as they might be relevant to BDBC. As soon as more specific advice is received this will be communicated so as to provide advice for applicants, residents and other interested parties in relation to affected planning applications.
In the meantime the council will not issue decisions for new residential development in the relevant catchment areas where wastewater generated by the development could have potential significant effects on Solent and Southampton Water Special Protection Area (SPA) and Solent Maritime Special Area of Conservation (SAC), unless Natural England have been consulted and confirmed no objection to the proposed development.
Case officers of current applications and appeals will be contacting applicants/agents on this matter. If there are any queries on whether your site is potentially impacted please contact the relevant case officer.
Update to Position Statement 10 May 2022
On 16 March 2022 the council received updated information from Natural England in relation to the methodology for calculating impact of development in relation to nitrates. Specifically with regards to the River Itchen catchment the guidance advises that phosphorous and nitrogen are causing environmental effects. Previously only nitrogen was considered to need mitigation. This is a significant change and will mean that the council will only be able to grant planning permission for new residential development, which potentially affects this catchment area, where the phosphate as well as the nitrate impact can be appropriately addressed. Unlike nitrate impact where mitigation has started to be identified enabling planning permissions to continue the position in relation to mitigation for phosphates where necessary is far more uncertain. This means that unless it can be shown how a development proposal will avoid or mitigate any adverse effect on the nationally protected sites, the council will not at present be in a position to grant permission within that catchment.
On 20 April 2022, Natural England issued a revised Solent (applicable to River Test catchment) nutrient budget calculator, see below for the latest version. The council continues to liaise with Natural England to ascertain whether any further updates to the calculator are likely pending in particular following a recent Court of Appeal decision. Accordingly the calculators (one related to the Itchen catchment and one related to the Test catchment) are being published for use by applicants on the basis of it being the most up to date position at this time.
Update to Position Statement June 2022
Further to updates provided on 10 May 2022 Natural England have released updated versions for the Itchen Nutrient Budget Calculator and the Solent Nutrient Budget Calculator. The council continues to engage with Natural England and will provide any further updates at the earliest opportunity.
Update to Position Statement February 2024
Natural England have released updated versions of the Itchen Budget Calculator and the Solent Nutrient Budget Calculator which can be found in the link below. There may be further changes to the calculators if any waste water treatment works are found to be exempt from the time requirements of the Levelling Up and Regeneration Act (2023). Any such exemptions are expected to be announced by April 2024. If you have a live application in at that time there may be a requirement to resubmit any nutrient neutrality information to comply with any new calculators and it is recommended that the case officer for the application is contacted for further advice. The council continues to engage with Natural England and will provide any further updates at the earliest opportunity.
View Solent Nutrients Basingstoke Catchment Map (PDF) [3.61mb]
View Natural England Summary Guide on Nutrient Neutrality (PDF) [146kb]
View Itchen and Solent Budget Calculators
View Natural England Advice on Achieving Nutrient Neutrality for New Development in the Solent Region V5 June 2020 (PDF) [2.38mb]
View Natural England Summary Advice on Achieving Nutrient Neutrality for New Development in the Solent Region V2 June 2020 (PDF) [3.61mb]
View Permit levels for Waste Water Treatment Works (WwTWs) within the River Test and River Itchen catchments (PDF) [181kb]
Strategic Mitigation - nutrient neutrality offsetting
A number of schemes are now coming forward outside of the Borough to mitigate the impact of nutrients generated by new development where this cannot be addressed on site. Such schemes are being generated by taking land out of agricultural use and putting the land to alternative uses in perpetuity following agreement with Natural England. Further details of schemes for the River Test and River Itchen catchments can be found at Nutrient Mitigation - Partnership for South Hampshire (push.gov.uk).
The Council has now entered into a legal agreement with Eastleigh Borough Council who have established such a Nutrient Neutrality Offsetting Scheme. This legal agreement enables applicants to bring forward development within the River Test catchment using Eastleigh Borough Council’s scheme for mitigation through the purchase of credits. Should applicants wish to explore whether this approach is suitable for their development proposals further details can be found at Nutrient Offset Scheme (eastleigh.gov.uk). The Council is also continuing dialogue with other strategic mitigation providers about the prospect of securing the use of further out of Borough mitigation schemes.
- Biodiversity Net Gain
-
Biodiversity Net Gain (BNG) is an approach to development, that aims to leave the natural environment in a measurably better state than beforehand. This means protecting and enhancing important existing habitats and ensuring that environmental features which are lost or degraded are compensated for by restoring or creating new habitats; it is a necessary approach to help enable the recovery of nature across England in light of the ecological emergency we are facing.
The Council have been requiring net gain from development for some years now, but new legislation has now come into force that makes it a statutory obligation.
On 12 February 2024 , mandatory biodiversity net gain commenced for major development under Schedule 7A of the Town and Country Planning Act 1990 (as inserted by Schedule 14 of the Environment Act 2021).
Small site development includes residential development where the number of dwellings is between 1 and 9, or if unknown the site area is less than 0.5 hectares, and commercial development where floor space created is less than 1,000 square metres or the total site area is less than 1 hectare. For small sites, mandatory BNG commenced from 2 April 2024 .
Please refer to the Council's current guidance for further information on the BNG webpage.